Volume and prices of balancing power
Volume of balancing power
Total ladder size
Ladder size ≤ 15 minutes
Primary reserve
Contracted regulating capacity
Contracted emergency capacity
Volume of settled regulating, reserve and emergency capacity
Financial overview balancing
Imbalanceprices
Cross border balancing
Volume of balancing power
Primary reserve
Contracted regulating capacity
Contracted emergency capacity
Total ladder size
Ladder size ≤ 15 minutes
Nederlands
Volume of balancing power
TenneT has set up a single buyer market for regulating and reserve capacity to be able to perform its tasks in the area of transmission and system services. On this single buyer market, market parties can offer regulating or reserve capacity to TenneT, i.e. capacity they can produce or consume over or under the amount reported in their E Programme.
TenneT primarily uses reserve capacity to solve transmission restrictions. Furthermore, we use reserve capacity, together with regulating capacity, to maintain or restore the balance between the demand for and supply of electricity in the Netherlands at any given moment.
The
Grid Code
contains stipulations about the compulsory and voluntary provision of regulating and reserve capacity to TenneT.
The procedures and specifications that bids must meet and the determination of the settlement price are described in the
Implementation Regulations
.
The use of bids by TenneT has been laid down in the
Grid Code
and the
System Code
.
A bid is an option in which a market party offers TenneT to do the following (when the option is exercised):
calculate an energy volume
settle this volume with the supplier at no less than the bid price
correct this volume on the imbalance of the PRP of the market party
The volume calculation is based on:
The size of the bid in MW
The direction (+/ -) of the bid:
to adjust upward (+): the supplier wants to produce more, or consume less
to adjust downward (-): the supplier wants to produce less (or consume more)
nature of the bid
Reserve capacity:
dispatched according to demand
volume calculated on the basis of the dispatch time offered
Regulating capacity:
continuously controlled through national load frequency control
Volume determined on the basis of a control signal
TenneT TSO activates bids for each direction according to the demand and in bid price order.
The data are shown per day, per Programme Time Unit (PTU) and per direction:
total ladder size
: arranged according to dispatch time
ladder size ≤ 15 minutes
: dispatch time ≤ 15 minutes, arranged according to nature
bid price ladder ≤ 15 minutes
: dispatch time ? 15 minutes, arranged according to bid price
TenneT TSO B.V.
Utrechtseweg 310
6812 AR Arnhem
Postbus 718
6800 AS Arnhem
Telefoon 026 373 11 11
Servicecentrum 026 373 17 17
E-mail servicecentrum@tennet.org
Internet www.tennet.eu / energieinfo.tennet.org